July 29, 2019. Engine 9, Ladder 2 respond mutual aid to Richmond for a working school fire. Engine 9 operated hand-lines inside before operations went defensive. Ladder 2 performed searches, opened up the ceiling, performed horizontal ventilation and attempted a trench cut to vertically ventilate. Due to the construction of the roof, L2 was unable to complete the trench cut before being ordered off the roof for safety reasons. L2 set up and operated its master stream for many hours before the fire was declared extinguished. KFD members rotated to and from the scene throughout the day because of the length of the operation.